It was another full day of work on our kitchen. Today the company (maybe I will mention them later with permission) ripped up two additional layers of sub flooring in our kitchen as well as removing all of our kitchen cabinets. Apparently water seeped under them as well. So here is our dining room where we eat all of our meals. The refrigerator, microwave, toaster, and pantry staples have been relocated in there.

My kids don’t mind all the clutter in there and are quite enjoying being able to reach snacks at the table all by themselves!




A long view of our kitchen. The upper cabinets are still attached. We won’t know for a few days if our lower cabinets are actually damaged by the water or if they just need to dry out the flooring. If the cabinets are damaged, then we’ll have to discuss replacing all of them.


You can see that the room is completely taped off by plastic sheeting. There is a zipper in the middle of one doorway so the worker’s can get in and out. And they are taking extra precautions not to spread mold spores in the house or dust particles. They know two of my children are asthmatic, so have been extra careful. This company is honestly rocking, so I will happily recommend them to any local folks.

After being home for just 6 days from our Christmas vacation in California, my youngest is really missing Grandma and Uncle Joey, Ken, and Jeff. She said today “I want to fly on airplane to Grandma’s and see Uncle Joey, Uncle Ken, and Jeff.” She wishes she was back in Grandma’s bed snuggling up and watching cartoons in bed.



















Holy moly that is alot of work being done by ALL hands. As for the little one I just may have to come and get her 🙂